ATEC

Air Warfare

GE’s ITEP Win & The Army’s Inch-By-Inch Revolution

Having wasted tens of billions and almost 30 years since the end of the Cold War, the Army is out of time. But after decades of incremental improvements, its existing weapons — including the UH-60 Black Hawk helicopter that GE’s new engine will upgrade – are overweight, underpowered, and running out of room to grow. Meanwhile, the Army’s attempts at a high-tech great leap forward kept getting cancelled as unaffordable, unfeasible, or both.

Air Warfare

Why America Really Needs ITEP Engines

With the Association of the US Army’s annual conference starting Monday, there is no better time for an analysis of the top modernization program for Army aviation. And we’ve got one of the top experts on helicopters providing the commentary, Mike Hirschberg of the American Helicopter Society International. Should the Army plow ahead with an engine upgrade […]

presented by
Air Warfare

Big SPAR Army Review May Topple ITEP

Critics say the Army could end up wasting billions by developing a better engine for its Sikorsky UH-60 Black Hawk and Boeing AH-64 Apache helicopters even as the joint Future Vertical Lift (FVL) initiative gets underway to replace those aircraft. The critics are wrong, program officials assure us. But the critics still disagree. A new Army […]

Air Warfare

Another Baby Step For Army Aviation’s ‘Top Priority’

Army aviation’s “top modernization priority program” – at least that’s what they call it – took another baby step forward this week. The service awarded preliminary design review contracts to the two competitors vying to build a better engine to power the service’s vast fleet of Sikorsky UH-60 Black Hawk and Boeing AH-64 Apache helicopters. […]