KC-46 Problems Should Not Add Delays; Possible Boeing Cost Rise: BG Shipton
WASHINGTON: More testing, due next month, is needed before the Air Force knows whether the undetected banging of the KC-46 tanker’s refueling boom is a problem that needs fixing. Preliminary data indicates the banging (formally known as Undetected Contacts Outside The Receptacle –UCOTR) is happening more frequently than it does in the existing tanker fleet, […]