Preparing the industrial base for when the Army’s FLRAA tiltrotor is built at scale
The program manager for the Future Long Range Attack Aircraft breaks down what the supply chain needs to be doing now for production.
The program manager for the Future Long Range Attack Aircraft breaks down what the supply chain needs to be doing now for production.
The Army has received its first two ITEP engines, and a re-engined Black Hawk will fly in late FY25/early FY26.
Special operators had planned for FARA to take the role of the AH-6, but the program’s cancellation “changed our equation,” a SOCOM official said.